Woman Carrying Her BIL’s Baby Refuses Unmedicated Water Birth, Now Everyone’s Furious

Helping family can feel like the right thing to do, especially when they have been struggling for years and finally turn to you as their last hope. But even the most generous decisions can become complicated when boundaries start to blur and gratitude turns into control.

In this case, a woman agreed to be a surrogate for her brother-in-law and his wife after watching them endure years of infertility heartbreak. What she did not expect was to lose her autonomy in the process.

From strict rules during pregnancy to demands about how she should give birth, tensions slowly built until a heated argument forced everything into the open.

With her due date fast approaching and emotions running high, she is now questioning whether standing her ground makes her selfish or simply realistic. Reddit had a lot to say about who actually gets to make decisions when someone else is carrying the baby.

A surrogate mother pushes back after intended parents demand a birth plan she refuses to follow

Woman Carrying Her BIL’s Baby Refuses Unmedicated Water Birth, Now Everyone’s Furious
Not the actual photo

AITAH for telling my BIL and his wife that I don’t want to follow their birth plan?

So I (34f) am a surrogate for my BIL Simon (39m) and his wife Michelle (38f).

Simon and Michelle have struggled with infertility for years.

They’ve tried IVF and even surrogacy before, but the person changed her mind at the last second.

They have outwardly shown their jealousy of my husband James (34m)

and me for having children, especially as only one of them was planned,

and our oldest was born when we were sixteen.

They came to me last year and begged me to be their surrogate.

I had doubts, as did my husband, but I felt bad for them and decided to go through with it.

James supported my decision and has acted like he did with my previous pregnancies, sweet and caring.

Simon and Michelle, on the other hand, are very controlling.

They made up meal plans for me, and I’m taking all these supplements as well as attending multiple classes.

When I told them I knew what to do during pregnancy, they didn’t listen

and said to me that just because I was pregnant four times doesn’t mean I’m an expert.

I gave up trying to dissuade them as I knew nothing would work.

We started going over the birth plan earlier this week, and it caused a huge argument.

They wanted me to do an unmedicated water birth, and I flat out refused.

For my second pregnancy, I didn’t have enough time for any pain relief, and the pain was horrific.

I have quite a high pain tolerance, but this experience was awful, and I never wanted to do that again.

(Kudos to anyone who has unmedicated births) As for the water birth,

I don’t like the idea of being submerged in water with blood, other fluids and possibly poop.

They weren’t happy about this.

They said this was their baby and they should decide how they were born.

I retorted and said, this is my body,

and I should decide how I want to push out a human that I’m so generously carrying for them.

A lot of shouting happened, and I started to get o__rwhelmed very quickly.

I started crying, and Michelle rolled her eyes and told me to grow up.

James told her to shut up, which started Simon off, and it was just a mess.

James and I left the house, and I was crying the whole way home

and regretting ever agreeing to be their surrogate.

It took James and me a few days to calm down, and during those days,

we didn’t have any contact with Simon or Michelle.

Simon and Michelle called James’ parents and complained to them about what happened,

so they called us, and we explained our side of the story.

They were shocked at what happened and said they were fully on our side

and that they’d talk with Simon and Michelle.

I’m due in two weeks, and I’m so nervous.

A part of me doesn’t want them there, but I know they have to be, seeing as it’s their child.

James disagrees. He said that he'll have them kicked out if they do anything to upset or stress me out.

Even my oldest agrees with him, and he won’t even be in the room..

I sort of do feel like an a__hole but I don’t know.

It’s a hard time right now

There is a quiet truth many people learn only when their body is on the line: generosity does not cancel out autonomy. Even when we are doing something profoundly selfless for someone else, our physical limits, fears, and boundaries still matter. When those are dismissed, the emotional cost can be just as painful as the physical one.

In this situation, the OP was not simply disagreeing over a birth plan. She was trying to protect her sense of safety while preparing for a major medical event. As a surrogate, she had already given up comfort, privacy, and control over months of her life.

See also  She Cut Off Her Father After A Salon Visit Went Wrong, But The Real Damage Went Far Beyond Her Hair

The conflict erupted when Simon and Michelle treated her body as a vessel rather than a person, insisting on an unmedicated water birth despite her prior traumatic experience with unmanaged pain.

Their insistence crossed from excitement into entitlement, while her emotional overwhelm was intensified by being talked down to and told to “grow up” in a moment of vulnerability.

A fresh way to look at the OP’s response is through the psychology of ownership versus embodiment. Simon and Michelle focused on the baby as “theirs,” which is understandable after years of infertility.

But pregnancy does not transfer bodily authority. Many people empathize deeply with intended parents and unintentionally minimize the surrogate’s lived experience. The OP’s refusal was not a rejection of the baby or the parents.

It was a boundary drawn at the point where sacrifice became coercion. Her husband’s support highlights another layer: stress during labor is not just emotional, it can be medically dangerous.

Trauma specialists note that a person’s sense of safety and control during childbirth is not optional, but central to both physical and psychological outcomes.

In Psychology Today, Ann Diamond Weinstein, Ph.D. explains that when pregnant individuals experience pressure, coercion, or dismissal of their boundaries during labor, it can activate the body’s fight-or-flight response and lead to lasting emotional distress.

She emphasizes that respectful, trauma-informed care prioritizes autonomy, voice, and choice, because stress and fear during childbirth can have real consequences for both the birthing person and the baby.

This perspective helps reframe the OP’s fear and hesitation. Her resistance was not emotional immaturity. It was an instinctive response to losing agency at a moment when agency is essential.

See also  Fiancée Sells Late Brother’s Chair To Pay For Gym Membership, Fiancé Flips Out

By pushing back, she was protecting both her mental health and the physical conditions needed for a safe delivery. The intended parents’ inability to prioritize her well-being suggests a deeper misunderstanding of what surrogacy requires: trust, respect, and restraint.

In the end, this story is not about who gets to “decide” a birth. It is about remembering that gratitude should never come with control. The most ethical path forward is one that ensures the OP feels supported, protected, and empowered through delivery, because a healthy birth begins with honoring the person bringing that life safely into the world.

Here’s what people had to say to OP:

These Redditors stressed that medical decisions always belong to the pregnant person

Exotic-Army4006 − Your the one going through a medical event, at the end of the day everything is your call

greyhounds4life1969 − NTA 'We want you to have an unmedicated birth,

we know the pain will be hidious for you but that's a sacrifice we're willing to make'

Yeah, no, they don't get to make those decisions

mmmmm_pi − NTA. You, as the pregnant person,

decide your birth plan with your doctor and anyone else you choose to involve.

I would not involve Michelle or Simon in the birth plan.

You are exactly right that this is your body and you get to make the choices.

and possibly poop There's no possibly here.

I've seen my wife give birth three times. Guaranteed poop.

This group argued the intended parents should not be in the delivery room

Tight-Background-252 − Absolutely NTA. They do NOT need to be in the room or part of your birth plan.

As soon as the baby is born and you are in recovery they can come and get their baby.

I can’t believe they are acting like this.

Drunkendonkeytail − They have no right to be present at the birth.

They can have the baby when it’s all over.

You will contact them when you are in labor and they will wait outside the birthing suite.

You won’t be seeing them again until there is a baby, and that’s final.

They will have no say about any medical procedures that involve your body. Period.

They lost the right to anything else when they overstepped

by demanding how your body would be treated during labor. NTA, but they sure are.

Capricorn_princess14 − NTA! Your body your choice tell the labor

and delivery department you don’t want them in there at all during labor and they will make it happen!

These commenters backed the surrogate, calling the couple ungrateful and controlling

ivyjade42 − NTA. My SIL was kind enough to be a surrogate for me

and I wouldn’t have dreamed of telling her how to give birth.

I’m sorry they’re being so ungrateful and rude about the huge sacrifice you’re making.

SteampunkHarley − NTA After 4 kids, you are most certainly an expert on how your body handles pregnancy

and know a helluva lot more than someone who has birthed 0 kids

highprincess60 − It’s your body and you’re the one pushing out the baby.

If you don’t want them in the labor room they don’t have to be there…

please don’t let them take advantage of your autonomy!

You are doing them a great service and they should be thankful.

If they wanted you to have an unmedicated water birth they should have stayed

that at the beginning and you could have declined.

You have this baby how YOU want to have it.

They have no say until the baby is out of your body and legally in their arms.

These users questioned the lack of contracts and urged stronger boundaries

Narrow_Guava_6239 − NTA but OP why didn’t you guys have the discussion about when the baby is due?

Before you said yes did you lay down any terms and conditions?

I understand you wanted to help your sister out

but it impacts you, your body, your mental wellbeing. EDIT: fixed sentence

ajaye90 − NTA! They shouldn’t be in the room if they aren’t going to be supporting YOU, who made this baby!

I’m assuming you aren’t getting any financial compensation for being their surrogate either?

This Redditor warned the delivery room could become a nightmare if stress continues

SummerStar62 − NTA . Guess what? THEY DO NOT HAVE TO BE THERE. In fact, at this point, I

’d say it’s guaranteed that they won’t be.

If I were your husband, I would not let them anywhere near you while you’re in labor.

They fucked that up for themselves. Big time. You are the pregnant person. It’s your body.

They don’t have any right to be telling you what to eat, what vitamins to take, or how you will give birth.

They can suggest. They can ask.

But the second they get pushy and in your f__king face is the time to go no contact

until the baby is born and if they don’t like it, too bad,

they can just shut the f__k up, AND BE GRATEFUL.

I’m just furious for you. I’m sorry. Have your husband be the point of contact for these last two weeks.

And if they won’t stop, I wouldn’t even tell them you’re in labor until the baby is almost ready to be born.

Tell them it happened too fast because your body knows what it’s doing.

And you barely had time to get to the hospital.

Oops there it is. This is a f__king nightmare in the delivery room waiting to happen.

Surrogacy is built on trust, respect, and clear boundaries, and when one of those cracks, everything feels unstable. Many readers sided firmly with the surrogate, seeing her refusal as an act of self-preservation rather than selfishness. Others wondered if clearer agreements could have prevented the conflict entirely.

Do you think the intended parents crossed an unforgivable line, or was this a fear-driven mistake that came too late to fix? Who should truly call the shots during childbirth? Share your thoughts below.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

© 2026 cuanhua | All rights reserved